A complete turn-key system was provided for the processing
of all the Waste Water for the City of Beaumont. The job consisted
of six (6) Motor Control Centers and ninety (90) individual control
buckets. Clayton Control Systems provided Engineering, MCC assembly,
MCC testing, MCC control start-up, and on-site training.